LEAN MANUFACTURING IN PRODUCT DEVELOPMENT: CASE STUDY IN A TEXTILE INDUSTRY

Authors

  • Diego Milnitz Author
  • Glauco Garcia Martins Pereira da Silva Author

DOI:

https://doi.org/10.56238/levv16n53-018

Keywords:

Lean Manufacturing, Lean Product Development, Value Stream Mapping, Gemba Kaizen, Textile Industry

Abstract

The reduction of lead time in the product development process (PDP) is one of the main challenges faced by organizations operating in dynamic and competitive markets, such as the textile sector. In this context, the application of lean manufacturing principles has proven to be a promising strategy to eliminate waste and increase efficiency. This article aims to analyze the joint application of Value Stream Mapping (VSM) and the Gemba Kaizen (GK) method in a multi-project PDP of a textile industry in Santa Catarina, seeking to highlight how these practices can contribute to continuous improvement. Methodologically, the study adopts action research, conducted in two intervention cycles: the first focusing on waste identification through VSM, and the second on implementing improvements via GK. The results revealed the existence of excessive information inventories, rework, and inconsistencies in material and data flows, which directly impacted lead time. The application of lean practices resulted in a 63% reduction in the rework rate in printing and a decrease of two days in the total PDP lead time. As a contribution, the study demonstrates the applicability of Lean Product Development in sectors still scarcely explored in the literature, such as textiles, while also highlighting the relevance of integrating classical quality tools with lean methodologies. It further suggests the need for future research on the digitalization of VSM and GK, aligning product development with the principles of Industry 4.0 and the circular economy.

Downloads

Download data is not yet available.

References

ÁLVAREZ, R.; CALVO, R.; PEÑA, M. M.; DOMINGO, R. Redesigning an assembly line through lean manufacturing tools. The International Journal of Advanced Manufacturing Technology. Madrid, n.170, setembro 2008.

ARAUJO, C. A. C. RENTES, A. F. A metodologia kaizen na condução de processos de mudança em sistemas de produção enxuta. Revista Gestão Industrial. v. 02, p. 126–135, 2006.

BALLANTYNE, D. Action research reviewed: a market-oriented approach. European Journal of Marketing, v. 38, n. 3/4, p. 321-337, 2004.

BAUCH, C. Lean Product Development: making waste transparent. 2004. 140 f. Tese (Doutorado em Engenharia Mecânica) MIT Massachusetts Institute of Technology, Massachusetts, 2004.

BRIALES, Julio A. Melhoria Contínua Através do Kaizen: Estudo de Caso DaimerChrysler do Brasil. 2005. 156f. Dissertação (Mestrado em Sistemas de Gestão) Universidade Federal Fluminense, Niteroi, 2005.

CAUCHICK, P. A. M. et al. Metodologia de pesquisa em engenharia de produção e gestão de operações. Rio de Janeiro: Elsevier, 2010.

COSTA, Daniel. Aplicação do Kaizen na Logística: As pessoas como fator de sucesso no desenvolvimento da empresa. Revista Técnica IPEP, São Paulo, SP, v. 7, n. 1, p. 45-54, jan./jun. 2007.

COUGHLAN, P.; COGHLAN, D. Action research for operations management. International Journal of Operations & Production Management [S.I.], v. 22, n. 2, p. 220-240, 2002.

CLARK, K. FIJIMOTO, C. Product Development Performance: strategy, organization and management in the world auto industry. HBS Press: 1991.

DAL FORNO A. J., Barquet A. P. B., Buson M. A., Gititana M. G. F. Gestão de desenvolvimento de produtos: integrando a abordagem Lean no projeto conceitual. Gestão da Produção, Operações e Sistemas, n. 4, out-dez. 2008.

DENNIS, P. Produção Lean Simplificada. Porto Alegre: Bookman, 2008.

FREIRE, J. and ALARCON, L. F. Achieving lean design process: Improvement methodology. Journal of Construction Engineering and Management-Asce, v. 128, n. 3, p. 248-256, 2002.

FERNANDES, P. A Framework For A Strategy Driven Manufacturing System Design In An Aerospace Environment – Design Beyond Factory Floor. 2001. 185 f. Dissertação (Mestrado em Aeronáutica e Astronáutica) MIT Massachusetts Institute of Technology, Massachusetts, 2001.

GOMES E. S. Investigação dos desperdícios no processo de desenvolvimento de produtos por meio da abordagem da produção enxuta. Dissertação de mestrado. Programa de Pós Graduação em Engenharia de Produção, Universidade Federal de Itajubá. Itajubá, 2008.

GOMES E. S., Pereira C. H. M., Sanches C. E. S., Almeida D. A. Análise da aplicação do mapeamento do fluxo de valor na identificação de desperdícios do processo de desenvolvimento de produtos. Revista Gestão & Produção. São Carlos, v. 16, n. 3, p. 344-356, jul.-set. 2009.

HANASHIRO, Airton. Proposta de modelo de gestão do conhecimento no piso de fábrica: estudo de caso de Kaizen em empresa do setor automotivo. 2005. 137f. Dissertação (Mestrado em Engenharia Mecânica) – Programa de Pós graduação em Engenharia Mecânica, Universidade Federal do Paraná, Curitiba, 2005.

JUNGEND, Daniel; SILVA, Sérgio L.; MENDES, Glauco H. S. O método kaizen como forma de aprimoramento do desempenho empresarial: a sistemática adotada em uma multinacional do setor de autopeças. In: Simpósio de Engenharia de Produção, 13., Bauru, 2006. Anais do XIII SIMPEP, Bauru, 2006.

KEYTE, B.; LOCHER, D. The Complete Lean Enterprise: value streams mapping for administrative and office process. New York: Productivity Press, 2004.

LEE, Q.; SNYDER, B. Value Stream & Process Mapping: genesis of manufacturing strategy. Bellingham: Enna Products Corporation, 2006.

LIKER, Jeffrey K.; MEIER, David. O modelo Toyota: manual de aplicação. Tradução de Lene Belon Ribeiro. Porto Alegre: Bookman, 2007.

LIKER, J. K. O modelo Toyota: 14 princípios de gestão do maior fabricante do mundo. Porto Alegre: Bookman, 2005.

MACHADO, M. C. Princípios enxutos no processo de desenvolvimento de produtos: Proposta de uma metodologia para implementação. 2006. 247f. Tese (Doutorado em Engenharia de Produção) – Programa de Pós graduação em Engenharia de Produção, Escola Politécnica da Universidade de São Paulo, São Paulo, 2006.

MARTINS P. G.; LAUGENI F. P. Administração da Produção. São Paulo: Saraiva, 2006.

MACMANUS, H. Product Development Value Stream Analysis and Mapping Manual – PDVSM. Cambridge: Lean Aerospace Initiative, 2003.

MORGAN, James M. High performance product development: a systems approach to a lean product development process. Thesis (Phd) in industrial and operations engineering. The University of Michigan: 2002.

NASH, M. A.; POLING, S. R. Mapping the total value stream: a comprehensive guide for production and transactional processes. Nova York: Productive press, 2008.

NETO, Joaquim A. S.; BARROS, José G. M. O Kaizen nas atividades de um provedor de serviços logísticos: estudo de caso em uma montadora de automóveis. In: Simpósio de Engenharia de Produção, 14., Bauru, 2007. Anais do XIV SIMPEP, Bauru, 2007.

OHNO, T. O Sistema Toyota de Produção: além da produção em larga escala. Porto Alegre: Bookman, 1997.

PEREIRA, F. A. Desenvolvimento de um método para construção de MFVs apoiado por sistemas de posicionamento via satélite. Qualificação de Doutorado. Programa de Pós Graduação em Engenharia de Produção, Universidade Federal de Santa Catarina. Florianópolis, 2009.

ROTHER, M.; SHOOK, J. Aprendendo a enxergar: mapeando o fluxo de valor para agregar valor e eliminar o desperdício. São Paulo: Lean Institute, 2003.

SALZMAN, R. Manufacturing System Design: Flexible Manufacturing Systems and Value Stream Mapping. 2002. 126f. Dissertação (Mestrado em Engenharia Mecânica) MIT Massachusetts Institute of Technology, Massachusetts, 2002.

SHINGO, Shingeo. O Sistema Toyota de produção: do ponto de vista da engenharia de produção. 2. ed Porto Alegre: Bookman, 1996.

SILVA, Glauco G. M. P. Implantando a manufatura enxuta: Um método estruturado. Dissertação de mestrado. Programa de Pós Graduação em Engenharia de Produção, Universidade Federal de Santa Catarina. Florianópolis, 2009.

SOBEK II, R. P.; WARD, A.C.; LIKAR, J.K. Toyota’s principles of set-based concurrent engineering. Sloan Management Review, Cambridge, v. 40, p. 67-83, winter, 1999.

SOLIMAN, F., Optimum level of process mapping and least cost business process re engineering. International Journal of Operations & Production Management, v.v18, n. 9/10, p.810-816, 1998.

TARALLO F. B., FORCELLINI, F. A. Mapeamento de fluxo de valor em atividades inerentes ao processo de desenvolvimento de produtos (PDP): um estudo de caso. XIV Simpósio de Engenharia de Produção. Novembro 2007.

THIOLLENT, M. Metodologia da pesquisa-ação. 14a. edição, São Paulo: Cortez Editora, 2005.

TUBINO, Dalvio F. Planejamento e controle da produção: teoria e prática. São Paulo: Atlas, 2007.

TURRIONI, J. B. MELLO, C. H. P. Metodologia de pesquisa em engenharia de produção. Programa de Pós Graduação em Engenharia de Produção da Universidade Federal de Itajubá. Itajubá, 2009.

WECHSLER, A.M.G. e TORRES JUNIOR, Alvair Silveira. Aplicação do conceito de produção enxuta e inovação de produtos em uma empresa calçadista brasileira. Revista Angrad, v. 10, n. 2, abril, maio/junho, 2009.

WOMACK, J. P; JONES, D. T. Lean Thinking: banish waste and create wealth in your corporation. Free Press: New York, 2003.

WOMACK, J. P; JONES, D. T. A mentalidade enxuta nas empresas: elimine o desperdício e crie riqueza. 6. ed Rio de Janeiro: Campus, 2004.

WOMACK, J. P; JONES, D. T; ROOS, D. A máquina que mudou o mundo. 4ª ed., Rio de Janeiro: Campus, 1992.

WHEELWRIGHT & CLARK. Revolutionizing product development: quantum leaps in speed, efficiency and quality. 1992.

Published

2025-10-02

How to Cite

MILNITZ, Diego; DA SILVA, Glauco Garcia Martins Pereira. LEAN MANUFACTURING IN PRODUCT DEVELOPMENT: CASE STUDY IN A TEXTILE INDUSTRY. LUMEN ET VIRTUS, [S. l.], v. 16, n. 53, p. e8632, 2025. DOI: 10.56238/levv16n53-018. Disponível em: https://periodicos.newsciencepubl.com/LEV/article/view/8632. Acesso em: 5 dec. 2025.