AN INTEGRATED RISK MANAGEMENT AND CONTRACT COMPLIANCE FRAMEWORK FOR SMALL BUSINESSES IN U.S. FEDERAL PROCUREMENT
DOI:
https://doi.org/10.56238/arev8n11-161Keywords:
Government Contracting, Federal Procurement, Small Business, Contract Management, Compliance Management, Risk Assessment, Internal Controls, Design Science, Performance IndicatorsAbstract
Federal procurement offers substantial opportunities to small firms, but contract award is only one stage in a longer cycle of operational, financial, documentary, and compliance obligations. Limited administrative capacity can make it difficult for small suppliers to translate solicitation provisions and contract clauses into coordinated internal routines. This article proposes the Integrated Federal Contract Risk and Compliance Framework (IFCRCF) for U.S. small businesses engaged in federal prime contracting. Following a design-science orientation and drawing on a targeted synthesis of peer-reviewed procurement scholarship and authoritative federal acquisition and internal-control sources, the study develops a six-stage contract-lifecycle architecture that combines an applicability register, obligation-to-control mapping, a risk register, evidence management, escalation rules, and performance indicators. The framework separates binding requirements from advisory management practices and introduces a two-layer decision logic: noncompensatory compliance gates followed by a provisional risk-prioritization matrix. Its outputs include a control library, a responsibility-assignment structure, an illustrative workflow, and a testable evaluation protocol. The study is conceptual: it reports no interviews, field pilots, or observed performance effects, and the framework is intended to complement—not replace—legal review, agency-specific guidance, and existing procurement-assistance programs. Its principal contribution is a traceable, adaptable mechanism for linking contract-specific requirements to proportionate organizational controls across the federal contracting lifecycle.
Downloads
References
Abutabenjeh, S., & Rendon, R. G. (2023). Procurement and contract management deficiencies: Analysis of state audit reports. International Journal of Public Sector Performance Management, 11(1), 81–107. https://doi.org/10.1504/IJPSPM.2023.128537 DOI: https://doi.org/10.1504/IJPSPM.2023.128537
Brogaard, L., Petersen, O. H., & Madsen, M. S. (2025). Skills and knowledge for public contract management: A taxonomy and integrative framework. Perspectives on Public Management and Governance, 8(3), 172–186. https://doi.org/10.1093/ppmgov/gvaf012 DOI: https://doi.org/10.1093/ppmgov/gvaf012
Cappelletti, M., Giuffrida, L. M., Heaton, S., & Siegel, D. (2026). Managing strategically in public procurement: Dynamic capabilities, set-asides, and contract outcomes. Strategic Change. https://doi.org/10.1002/jsc.70104 DOI: https://doi.org/10.1002/jsc.70104
Committee of Sponsoring Organizations of the Treadway Commission. (2017). Enterprise risk management—Integrating with strategy and performance. https://www.coso.org/erm-framework
Cox, L. A., Jr. (2008). What’s wrong with risk matrices? Risk Analysis, 28(2), 497–512. https://doi.org/10.1111/j.1539-6924.2008.01030.x DOI: https://doi.org/10.1111/j.1539-6924.2008.01030.x
Federal Acquisition Regulatory Council. (2026). Revolutionary FAR Overhaul: FAR Part Deviation Guidance and Frequently Asked Questions. https://www.acquisition.gov/far-overhaul/far-part-deviation-guide ; https://www.acquisition.gov/far-overhaul/faqs
Federal Acquisition Regulation. (2026). 48 C.F.R. § 4.1102—System for Award Management: Policy. https://www.acquisition.gov/far/4.1102
Federal Acquisition Regulation. (2026). 48 C.F.R. § 9.104-1—General standards. https://www.acquisition.gov/far/9.104-1
Federal Acquisition Regulation. (2026). 48 C.F.R. § 42.1501—Contractor performance information. https://www.acquisition.gov/far/42.1501
Federal Acquisition Regulation. (2026). 48 C.F.R. § 43.102—Contract modifications: Policy. https://www.acquisition.gov/far/43.102
Federal Acquisition Regulation. (2026). 48 C.F.R. § 46.401—Government contract quality assurance: General. https://www.acquisition.gov/far/46.401
Federal Acquisition Regulation. (2026). 48 C.F.R. § 4.804-5—Procedures for closing out contract files. https://www.acquisition.gov/far/4.804-5
Federal Acquisition Regulation. (2026). 48 C.F.R. §§ 52.203-13, 52.204-21, 52.219-14, and 52.232-25—Selected contract clauses. https://www.acquisition.gov/far/52.203-13 ; https://www.acquisition.gov/far/52.204-21 ; https://www.acquisition.gov/far/52.219-14 ; https://www.acquisition.gov/far/52.232-25
Flynn, A. (2026). Research on SME involvement in public procurement: A review, critique and conceptual framework. Journal of Purchasing and Supply Management, 32(2), Article 101052. https://doi.org/10.1016/j.pursup.2025.101052 DOI: https://doi.org/10.1016/j.pursup.2025.101052
Gregor, S., & Hevner, A. R. (2013). Positioning and presenting design science research for maximum impact. MIS Quarterly, 37(2), 337–355. https://doi.org/10.25300/MISQ/2013/37.2.01 DOI: https://doi.org/10.25300/MISQ/2013/37.2.01
Hevner, A. R., March, S. T., Park, J., & Ram, S. (2004). Design science in information systems research. MIS Quarterly, 28(1), 75–105. https://doi.org/10.2307/25148625 DOI: https://doi.org/10.2307/25148625
International Organization for Standardization. (2018). ISO 31000:2018 Risk management—Guidelines. https://www.iso.org/standard/65694.html
Peffers, K., Tuunanen, T., Rothenberger, M. A., & Chatterjee, S. (2007). A design science research methodology for information systems research. Journal of Management Information Systems, 24(3), 45–77. https://doi.org/10.2753/MIS0742-1222240302 DOI: https://doi.org/10.2753/MIS0742-1222240302
Pourre, C. B. F., & Magalhães, M. T. Q. (2025). Indicadores de planejamento urbano e transportes: Análise comparativa de três experiências brasileiras [Urban planning and transport indicators: A comparative analysis of three Brazilian experiences]. Paranoá, 18, Article e59408. https://doi.org/10.18830/1679-09442025v18e59408 DOI: https://doi.org/10.18830/1679-09442025v18e59408
Pourre, C. B. F., Moysés, D. A., Magalhães, M. T. Q., & Fernandes, J. H. C. (2022). Processos finalísticos de um CESU [Core processes of an urban sustainability efficiency center]. In J. H. C. Fernandes, D. A. Moysés, M. T. M. Carvalho, & M. B. Bernardes (Eds.), CESUs: Centros de Eficiência em Sustentabilidade Urbana (Livro Branco): Vol. III. Proposições e perspectivas. Editora ECoS. https://repositorio.ecos.unb.br/exhibits/show/editoraecos/item/563
Santos, K. C. de J. (2026). Barriers to federal contracting participation among U.S. small businesses: A contracting readiness assessment framework for diagnosing competitive capacity. Revista de Geopolítica, 17(10), Article e3867. https://doi.org/10.56238/revgeov17n10-225 DOI: https://doi.org/10.56238/revgeov17n10-225
U.S. Government Accountability Office. (2025a). Small business contracting: National Nuclear Security Administration needs increased contractor oversight to reduce reporting errors (GAO-25-106820). https://www.gao.gov/products/gao-25-106820
U.S. Government Accountability Office. (2025b). Standards for internal control in the federal government (2025 revision; effective fiscal year 2026). https://www.gao.gov/greenbook
U.S. Small Business Administration. (2026, June 25). SBA releases FY25 scorecard for small business contracting (News release 26-64). https://www.sba.gov/article/2026/06/25/sba-releases-fy25-scorecard-small-business-contracting
Venable, J., Pries-Heje, J., & Baskerville, R. (2016). FEDS: A framework for evaluation in design science research. European Journal of Information Systems, 25(1), 77–89. https://doi.org/10.1057/ejis.2014.36 DOI: https://doi.org/10.1057/ejis.2014.36