[1]
Accioly, R. de M. e S. and Costa, F. da S. 2025. MODELING THE COST OF CONSTRUCTING AN OFFSHORE DRILLING RIG USING RANDOM FOREST. ARACÊ . 7, 11 (Nov. 2025), e9527. DOI:https://doi.org/10.56238/arev7n11-001.